About
Trusted sealing solution for the oil & gas industry
// ABOUT US
At SealMor, we stop leaks and safeguard vital oil and gas infrastructure — from deep downhole to topside equipment.
With 40+ years of combined experience, we solve tough challenges fast, ensuring your systems stay safe, efficient, and reliable.
// WHAT WE DO
We provide specialist sealing solutions that protect the integrity of oil and gas operations at every stage — from exploration to production.
Our expertise covers leak prevention, repair, and system optimisation, delivering proven results that keep your operations running smoothly.
// OUR MISSSION
We focus on stopping leaks across the asset lifecycle to minimise downtime and risk.
Our mission is to maintain operational integrity and extend asset life, protecting both people and the environment.
// WHY CHOOSE SEALMOR
Proven track record: decades of field experience across downhole and topside applications.
Comprehensive expertise: from well intervention to topside maintenance, with integrated sealing solutions end-to-end.
Safety and sustainability: we operate to industry standards and best practice, with respect for people and the environment.
Rapid, reliable response: quick assessment and execution to reduce downtime and risk.
// OUR PROCESS
1. Consultation
Project Kick-Off & Leak Identification
Identifying leaking equipment, then follow procedures to measure the leak rate and pinpoint its source.
2. Preparation
Mobilization & Leak Testing
The onshore team will dispatch the necessary sealing chemicals, systems, and equipment for connection to the well system or topside equipment.
Once the SealMor team arrives on site, they will work with the client’s team to rig up, perform leak-off tests, and confirm both the leak point and leak rate.
3. Completion
Leak Sealing Operations
Based on the findings from Step 2, the SealMor team will:
- Plan the appropriate chemical mix.
- Determine the method of delivering chemicals to the leak point.
- Begin injection gradually to build pressure and seal the leak.
- If needed, pump additional chemicals over the leak point.
Based on the findings from Step 2, the SealMor team will:
- Plan the appropriate chemical mix.
- Determine the method of delivering chemicals to the leak point.
- Begin injection gradually to build pressure and seal the leak.
- If needed, pump additional chemicals over the leak point.
